Chirayuthchai TraisaengsatheanStrategic Finance for Property Development

International standards for the hospitality business

A framework of hotel, restaurant and wellness standards for investment-grade resort projects

Key takeaways

  • An investment-grade resort project must set standards across four dimensions at the same time: finance, operations, Thai law and ESG.
  • It is important to distinguish clearly which standards are legally mandatory, which come from contracts or lenders, and which are strategic options.
  • The 12th edition of USALI takes effect on 1 January 2026, and the compliance costs in this article are budget examples only.

This article uses a hypothetical sample project, a 5-star resort on the Andaman coast comprising a hotel, a restaurant collection, wellness & spa and branded residences, to explain the standards framework. The standards are divided into Must Have, Should Have and Nice to Have, from pre-opening through to stabilised operations.

1. Why international standards matter

A good location and attractive design are not enough. What separates an investment-grade project from an ordinary one is a system of standards embedded in day-to-day operations. Banks and institutional investors treat alignment as part of their assessment: for example, they expect USALI-based financial reporting for benchmarking, and they expect ESG data when sustainable finance is used.

2. Hotel standards

2.1 Accounting and reporting

USALI classifies revenue and costs by department and separates undistributed expenses from departmental profit. The current edition is the 12th Revised Edition, published by HFTP and effective from 1 January 2026. Thai legal entities must prepare financial statements under Thai financial reporting standards, and projects with an HMA must consider TFRS 15 and TFRS 16 based on the facts of the contract.

2.2 USALI KPIs

KPIFormula5-star luxury benchmark (approximate)
ADRRoom Revenue ÷ Rooms SoldTHB 12,000–25,000
OccupancyRooms Sold ÷ Rooms Available65–80%
RevPARADR × OccupancyTHB 8,000–18,000
TRevPARTotal Revenue ÷ Rooms AvailableTHB 12,000–25,000
GOPPARGOP ÷ Rooms AvailableTHB 6,000–12,000
Cost Per Occupied RoomVariable Cost ÷ Rooms SoldTHB 800–1,500
GOP MarginGOP ÷ Total Revenue45–55%
EBITDA MarginEBITDA ÷ Revenue35–45%
Labour CostTotal Labour ÷ Revenue25–32%
F&B Cost(Food + Bev Cost) ÷ F&B Revenue28–32%
Energy IntensitykWh per Occupied Room50–80 kWh

These ranges are a starting framework, not statistics. Check them against actual market data for the relevant period.

2.3 Quality and ratings

Forbes Travel Guide assesses several hundred points from before arrival to departure. AAA Diamond focuses on physical facilities and service. LQA uses mystery shoppers, and the Michelin Guide has extended its hotel rankings through the Michelin Key since 2024.

2.4 Operations and safety

StandardScopeLevel
HACCPFood SafetyPractical Must Have
ISO 22000Food Safety ManagementShould Have
ISO 9001Quality ManagementShould Have
ISO 14001Environmental ManagementMust Have when specified in EIA conditions or contracts
ISO 45001Occupational Health & SafetyShould Have
ISO 41001Facility ManagementNice to Have
ISO 50001Energy ManagementShould Have

2.5 Sustainability

Consider certification in at least two areas to support green financing, for example LEED for the building and EarthCheck for operations. Supplementary standards include Green Key, Travelife and Green Globe.

2.6 Brand Standards

Brand tier (example)Room size (sq m)Staff-to-RoomF&B Outlets
Ultra-Luxury Resort60–100+2.5–3.5 : 14–6
Luxury International50–852.0–3.0 : 13–5
Luxury Villa Resort70–1002.0–2.5 : 13–4
Luxury Collection45–651.8–2.5 : 13–4

Use this as a preliminary design framework. Actual values must be taken from the brand standards documents of the chosen brand.

3. Restaurant standards

3.1 Accounting and KPIs

USAR (Uniform System of Accounts for Restaurants) is applied at outlet-level P&L, which is then consolidated into F&B in USALI.

KPIFormulaFine dining (approximate)
Food CostFood Cost ÷ Food Revenue28–35%
Beverage CostBev Cost ÷ Bev Revenue18–25%
Total COGS(Food + Bev) ÷ Total Revenue30–35%
Labour CostTotal Labour ÷ Revenue28–35%
Prime Cost(COGS + Labour) ÷ RevenueBelow 60–65%
Rent / OccupancyRent ÷ Revenue6–10%
EBITDA MarginEBITDA ÷ Revenue15–20%
Average CheckRevenue ÷ CoversTHB 2,500–8,000
Table TurnoverCovers ÷ Seats per Day1.5–2.5x
RevPASHRevenue per Available Seat HourDepends on the restaurant concept

Prime cost is a key indicator. Above 65%, a restaurant will struggle to be sustainably profitable. The sample project sets a ceiling of 62%.

3.2 Quality and ratings

The Michelin Guide is divided into 1–3 Stars, Bib Gourmand and Selected, while World's 50 Best and Asia's 50 Best are based on voting. The Michelin Green Star recognises sustainability. For food safety, use HACCP, GHP and GMP as appropriate, and consider Halal where the target customers require it.

3.3 Restaurant types

TypeAvg check (THB)Food CostService Style
3-Star Michelin8,000–15,00035–40%Tasting menu, sommelier
2-Star Michelin5,000–10,00032–38%Plated, expert pairing
1-Star Michelin3,000–7,00030–35%Refined casual
Hotel Fine Dining2,500–6,00030–35%All-day dining
Casual / Bistro800–2,50028–32%À la carte
Bar / Lounge1,500–3,50022–28%Cocktails, small plates

4. Wellness and spa standards

4.1 Industry bodies

The Global Wellness Institute produces research and the Wellness Economy framework, and ISPA publishes an annual benchmark. For therapists, CIDESCO and CIBTAC can be used as reference criteria.

4.2 ISPA KPIs

KPIFormulaLuxury spa (approximate)
Treatment Room UtilizationHours Used ÷ Hours Available50–70%
Avg Revenue per TreatmentRevenue ÷ TreatmentsTHB 4,000–8,000
Average Treatment LengthTotal Hours ÷ Treatments60–90 minutes
Therapist ProductivityTreatments per Therapist Day4–6
Capture RateHotel Guests Using Spa15–25%
Retail-to-TreatmentRetail ÷ Treatment Sales8–15%
Repeat ClientReturning Customers30–40%
Service CostDirect Costs ÷ Revenue22–28%
Labour CostTherapist + Support ÷ Revenue35–45%
EBITDA MarginEBITDA ÷ Revenue25–40%

4.3 Medical Wellness

Services involving medical treatment or procedures may fall within the definition of a medical facility under the Medical Facilities Act and require a licence from the Department of Health Service Support. Check the scope with a legal adviser. JCI is the international standard for medical facilities, and laboratories may consider CAP.

4.4 Wellness Economy

The GWI framework covers categories such as Personal Care & Beauty, Healthy Eating, Physical Activity, Wellness Tourism, Public Health & Prevention, Traditional & Complementary, Mental Wellness and Workplace Wellness. The share of each category changes with the reporting year, so refer to the latest report when using figures.

5. Cross-industry standards

5.1 Service quality

SERVQUAL, NPS, CSAT, proactive review monitoring and quarterly mystery shoppers

5.2 ESG

StandardScope
GRI StandardsSustainability Reporting
SASB StandardsInvestor-grade ESG Disclosure
TCFD / IFRS S2The TCFD's Climate-related Financial Disclosures have been handed over for monitoring to IFRS S2.
UN SDGsThe 17-goal framework
HCMIHotel Carbon Measurement
Carbon Neutral CertificationNet-Zero Pathway
B CorpSocial & Environmental Impact

5.3 Safety

Reference frameworks may include OSHA, NFPA, WHO Guidelines, ASME and crowd safety standards for large events. Thai building and safety laws, however, take precedence.

5.4 Personal data

The PDPA has been fully in force since 1 June 2022. GDPR applies where customers in the European Union are within scope. PCI DSS applies when accepting cards, and ISO 27001 is the information security management standard.

6. Thailand-specific standards

StandardIssuer/regulatorScope
Department of Tourism accommodation standardsDepartment of TourismA quality certification, separate from the hotel business licence
SHATourism and public health authoritiesA COVID-era scheme; check its current status before referring to it
Green HotelDepartment of Environmental Quality PromotionHotel sustainability
Thai Spa StandardDepartment of Health Service SupportWellness businesses under the relevant laws
Halal Hotel / RestaurantThe relevant halal certification bodySelected outlets
MICE StandardsTCEBEvent & Conference
Medical Facilities ActDepartment of Health Service SupportServices that qualify as medical facilities

7. Financial and valuation standards

7.1 Valuation

The DCF and cap rate approaches commonly used in the industry, the RICS Red Book for valuation, and market data from STR/CoStar are frameworks worth knowing.

7.2 Banking and project finance

Loan documents may refer to LMA or APLMA terms, and covenants are subject to negotiation. Example conditions for a luxury hospitality project might be a minimum DSCR of 1.30x, LLCR of 1.40x and PLCR of 1.60x, but the actual thresholds depend on the bank and the project's risks.

8. Prioritisation

8.1 Must Have

StandardApplies toReason
Current edition of USALIHotel Financial StructureBank and investor expectations
HACCPAll F&B outletsFood safety controls
TFRSGroup financial statementsAudit
PDPA ComplianceAll BUsThai law
Licences and premises standardsHotel, Spa, ClinicBusiness operation
Building Code & Fire SafetyConstructionPermit
ISO 14001 where it is an EIA conditionResort-widePermit conditions
Brand standards and auditsHotelBrand conditions

8.2 Should Have

  • ISO 22000 and EarthCheck
  • LQA Inspection
  • ISO 9001 and ISO 45001
  • ISPA Benchmarks
  • ISO 50001
  • Michelin Aspiration
  • JCI for medical wellness
  • NPS Framework
  • Carbon Neutral Pathway

8.3 Nice to Have

  • B Corp
  • LEED Gold/Platinum
  • Wellness Tourism Association Membership
  • World's 50 Best and Asia's 50 Best
  • Michelin Green Star

9. Sample implementation roadmap

PeriodMain activities
Pre-opening, year −3EIA, application for investment promotion if applicable, ISO 14001 framework, HACCP plan
Pre-opening, year −2Construction Standards, LEED/EDGE Registration, PDPA Program, Brand Standard Alignment
Pre-opening, year −1HACCP/ISO 22000 Implementation, Spa License, Forbes Pre-Audit, Staff Training
Operations, year 1USALI Day-1, Forbes Audit, LQA, First Sustainability Report, ISO 9001
Operations, year 2EarthCheck, Michelin Submission, ISPA Membership, Carbon Footprint Baseline
Operations, year 3 onwardsMichelin, EarthCheck Gold, Asia's 50 Best, Carbon Neutral Pathway, B Corp

10. Estimated compliance costs (example)

StandardOne-time (THB)Annual (THB)
HACCP / ISO 220000.5–1.0 million200–400 thousand
ISO 9001 / 14001 / 450011–2 million300–600 thousand
LEED Certification5–10 million—
EarthCheck0.5 million200 thousand
Forbes Travel Guide—500 thousand–1 million
PDPA Compliance1–2 million500 thousand
Thai Spa Standard100 thousand100 thousand
Premises standards/renewals100 thousand100 thousand
TotalApprox. 8.2–15.7 millionApprox. 1.9–2.9 million/year

These figures are an indicative budget framework. Obtain actual quotations before setting a budget.

11. Conclusion

Raising a project to investment-grade level requires integrating four dimensions: finance based on USALI, TFRS and loan documentation; operations based on brand, food safety and spa benchmarks; Thai law; and ESG. There should be a responsible owner who reports to top management, and an annual compliance dashboard to track the status of each standard systematically.