Chirayuthchai TraisaengsatheanStrategic Finance for Property Development

Tools

Calculators, templates, checklists and reference material drawn from the four handbooks, for development work from land purchase through to transfer day and exit

  • Every tool includes example figures from the handbooks
  • Runs in your browser; no data is sent out
  • Print or save as PDF
Type
Handbook

Calculators 22

Every calculator is pre-filled with example figures from the handbooks. Change a figure and the result recalculates immediately.

Capital structure, debt and JV

Templates 7

Enter the data on the left and the document on the right updates accordingly, then print or save it as a PDF to use as a draft

Checklist 7

Tick items and save your progress in this browser. Includes a notes field for each category and a sign-off field

Reference 4

Tax rate tables, filing deadlines, financial formulas and step cards to print and keep on your desk

  1. Start with the example Every page is pre-filled with sample figures from the handbooks. Read the results first, then replace them with your project's figures
  2. Check rates and conditions Tax rates, covenant thresholds and legal references can all be edited in every field. Check the current version before use
  3. Use them in sequence Each page links to the next tool to use, for example from RLV to the Feasibility Study summary and then to the loan application checklist

All tools provide general information for educational purposes. The figures are hypothetical examples and are not specific advice on investment, law, accounting or tax. The templates illustrate document structure, and their wording must be reviewed by a professional before actual use