Capitalising interest as cost (TAS 23)
Calculate the interest that can be capitalised into WIP each month, for both specific project loans and general borrowings, with a ceiling test and journal entries
Extracted from Real Estate Project Accounting Handbook · Part 3, Chapter 8: Interest under TAS 23
Example based on Chapter 8: a project loan with THB 400 m drawn at 7%, THB 100 m of undrawn funds earning 2% deposit interest, and three general loans totalling THB 400 m.